Comment Re:A US example (Score 1) 34
Also it cost about $5.2M to build the plant, and it saves about $300k in annual fuel costs. The city got various grants to reduce their initial outlay, but it's a pretty long breakeven (plus they needed to replace the trucks with LNG variants, though I believe that they were already due for replacement anyway)
Certainly it seems amazingly wasteful to just flare the methane from wastewater and landfill facilities, but maybe if we captures it at a larger scale the costs for that equipment would fall.