Learn More

Average Ratings 136 Ratings

Total
ease
features
design
support

Average Ratings 0 Ratings

Total
ease
features
design
support

No User Reviews. Be the first to provide a review:

Write a Review

Description

InEight is integrated project controls software for capital construction, built as a modular platform where cost, schedule, contracts, and project information share one connected foundation. Organizations implement flexibly and scale from a single complex project to a billion-dollar capital portfolio. Purpose-built applications cover every project phase, and because the products are connected, field data updates budgets, forecasts, and schedules in real time, so every team works from the same numbers. Advanced analytics turn live project data into smarter decisions. Customers in 60+ countries run more than $1 trillion in projects on the platform, across industries including mining, nuclear, power and renewables, transportation, water, and oil, gas, and chemical. Teams use InEight to standardize best practices, manage budgets and forecasts, control scope changes, and modernize how capital projects get delivered.

Description

QuantumPM Earned Value Manager harnesses the scheduling capabilities of Microsoft Project to refresh the actual work completed on a project, allowing for smooth integration into reporting processes. You can monitor your real progress against work packages while automatically generating all standard earned value metrics. This tool merges earned value management best practices with scheduling and fundamental reporting features. It boasts a user-friendly graphical interface and a report wizard that guides you in crafting a robust plan and assessing actual progress relative to that plan. By automatically handling all EVM calculations, it frees you up to focus on analysis and management tasks instead of getting bogged down in mathematics. Additionally, it enforces change control and other EVM best practices, simplifying the documentation process to demonstrate compliance for your project. You can also import actual costs from your financial system, along with actual effort or percentage complete data directly from Microsoft Project, streamlining your project management efforts even further. Ultimately, this tool enhances the efficiency and accuracy of project tracking and reporting, making it a vital asset for project managers.

API Access

Has API Yes 

API Access

Has API No 

Screenshots View All

Screenshots View All

Integrations

Microsoft Project Yes 
Deltek Cobra No 
Deltek Open Plan Yes 
Deltek wInsight No 
Dropbox Yes 
EarthCam Yes 
Felix Yes 
JD Edwards EnterpriseOne Yes 
Jovix Yes 
Microsoft OneDrive Yes 
Microsoft PowerPoint Yes 
Microsoft SharePoint Yes 
Microsoft Word Yes 
Navisworks Yes 
Okta Yes 
Revit Yes 
Salesforce Yes 
SiteSense Yes 
Trunk Tools Yes 
Viewpoint Vista Yes 

Integrations

Microsoft Project Yes 
Deltek Cobra Yes 
Deltek Open Plan No 
Deltek wInsight Yes 
Dropbox No 
EarthCam No 
Felix No 
JD Edwards EnterpriseOne No 
Jovix No 
Microsoft OneDrive No 
Microsoft PowerPoint No 
Microsoft SharePoint No 
Microsoft Word No 
Navisworks No 
Okta No 
Revit No 
Salesforce No 
SiteSense No 
Trunk Tools No 
Viewpoint Vista No 

Pricing Details

No price information available.
Free Trial No 
Free Version No 

Pricing Details

$799 one-time payment
Free Trial No 
Free Version No 

Deployment

Web-Based Yes 
On-Premises No 
iPhone App Yes 
iPad App Yes 
Android App Yes 
Windows Yes 
Mac Yes 
Linux No 
Chromebook No 

Deployment

Web-Based Yes 
On-Premises No 
iPhone App No 
iPad App No 
Android App No 
Windows No 
Mac No 
Linux No 
Chromebook No 

Customer Support

Business Hours Yes 
Live Rep (24/7) Yes 
Online Support Yes 

Customer Support

Business Hours Yes 
Live Rep (24/7) No 
Online Support Yes 

Types of Training

Training Docs Yes 
Webinars Yes 
Live Training (Online) Yes 
In Person Yes 

Types of Training

Training Docs Yes 
Webinars No 
Live Training (Online) No 
In Person Yes 

Vendor Details

Company Name

InEight

Founded

2014

Country

United States

Website

ineight.com

Vendor Details

Company Name

QuantumPM

Country

United States

Website

www.quantumpm.com/earned-value-manager/

Product Features

BIM

Building Information Modeling (BIM) becomes truly beneficial when the entire project team can access and utilize the models effectively. InEight Model facilitates this by creating a collaborative visual platform on the InEight system, where 3D models are consolidated into a singular federated view, seamlessly integrated with real-time project data. This enables teams to perform model coordination in context, associate documents and project information with specific model elements, and utilize visual scheduling to monitor status directly at the worksite. As a federated modeling environment, InEight Model complements the BIM authoring tools that your designers are accustomed to, while also managing model versions as designs evolve. Additionally, model-based takeoff integrates quantity data into InEight Estimate, allowing planners and field teams to refer to the same models generated by the engineering team. For capital construction groups aiming to leverage BIM for informed decision-making throughout the project lifecycle, InEight centralizes models and project information, making it simpler to assess the costs and feasibility of design choices with the model conveniently aligned with the financial data.

2D Drawing Yes 
3D Modeling Yes 
Change Management Yes 
Collaboration Yes 
Conflict Tracking Yes 
Design Modeling Yes 
Document Management Yes 
For Facility Management Yes 
Mobile Access Yes 
Scheduling Yes 

Capital Project Management

Capital project management requires organizations to maintain a comprehensive overview of extensive projects, various delivery partners, and countless decisions made over time. InEight is designed to provide that perspective. With this platform, owners and contractors can efficiently plan, estimate, and schedule tasks; manage costs and modifications; oversee contracts and documentation; and monitor field progress, all from a single interface. The InEight Report & Explore feature aggregates real-time project data for comprehensive portfolio reporting at the program level. Thanks to its interconnected data model, both executive dashboards and field reports reflect the same foundational information. Owner teams leverage InEight to unify processes across different projects and delivery approaches, whether it be Design–Build or EPC, ensuring that vital institutional knowledge is preserved as projects transition. In various sectors, including mining, nuclear, energy, transportation, water, and oil, gas, and chemicals, teams in over 60 countries utilize InEight to manage capital projects exceeding $1 trillion in value.

Civil Engineering

Civil engineering projects rely heavily on quantitative metrics: the volume of earth moved, the length of materials installed, and the hours dedicated by crews. InEight captures these metrics comprehensively. The InEight Estimate module generates estimates based on resources like labor, machinery, and materials, utilizing unit costs that are informed by historical performance benchmarks. In the field, InEight Plan & Progress tracks installed quantities, daily logs, and crew hours, allowing for real-time visibility into productivity and cost per unit, providing opportunities for timely intervention. InEight Schedule incorporates Critical Path Method (CPM) scheduling along with risk assessments for extensive, multi-stage projects, while InEight Control links budgets, forecasts, and actual expenditures as the project unfolds. Civil contractors and their clients rely on InEight for projects in transportation, water management, power, and renewable energy sectors, among others. For self-performing tasks where profitability hinges on production rates, InEight ensures that estimated and actual performances are tracked within the same platform, making comparisons unavoidable.

Construction Bid Management

Effective construction bid management relies on both swift execution and assured accuracy in financial estimations. InEight Estimate equips contractors with these essential tools. It allows users to create bids using adaptable estimate frameworks that reflect the construction process, calculating costs for labor, teams, equipment, and materials in a comprehensive manner while also verifying totals through integrated benchmarking based on previous project outcomes. The bid wizard accelerates the bidding process, while the quote management feature enables side-by-side comparisons of subcontractor and supplier costs. Estimators can explore various pricing options before finalizing their decisions, and the successful bid seamlessly transitions into the execution budget within the InEight Platform, preserving its foundational assumptions and linking them to cost management and scheduling. Estimating teams maintain a reliable record of the calculations for each figure, which proves valuable during bid evaluations and potential claims in the future. Contractors in sectors such as transportation, mining, and oil, gas, and chemicals utilize InEight to effectively bid on and execute capital projects.

Bidder Management No 
Building Product Database No 
Cost Database No 
File Sharing No 
Proposal Management No 
Quotes / Estimates Yes 
RFP Management Yes 
Subcontractor Management Yes 
Takeoff Yes 
Version Control Yes 

Construction Data Analytics

The effectiveness of construction data analytics hinges on the quality of the underlying data. InEight's Report & Explore utilizes real-time information gathered from the InEight Platform, encompassing aspects such as costs, schedules, quantities, modifications, and field progress as they occur. The dashboards empower project teams to navigate from a high-level portfolio overview to the specifics behind any discrepancies, while executive dashboards aggregate the same data for higher management insights. Cross-project reporting highlights recurring performance trends, and the use of standardized data frameworks ensures that comparisons across different projects remain relevant. Since Report & Explore relies exclusively on data sourced from InEight’s suite of products, every statistic can be traced back to its original record, effectively resolving disputes over data accuracy. Both contractors and owners rely on it for end-of-month reporting, portfolio assessments, and project evaluations based on up-to-date information. Project engineers, financial controllers, and executives can all access the same data source, tailored to their respective levels of detail.

Construction Drawing Management

Managing construction drawings on a construction site ultimately hinges on one essential question: is this the latest version? InEight Document ensures that drawings are maintained under strict document control, featuring a unique registry for each drawing and its revisions, version management for every release, and regulated distribution via transmittals, ensuring that the field works from up-to-date documents. The platform facilitates review and approval processes, complete with deadlines and transparent tracking of each drawing's status. An audit trail captures user-level actions, and transmittal read receipts confirm who received which revision and at what time. With metadata tagging and efficient search capabilities, finding the correct drawing takes seconds instead of hours spent sifting through files. Within the InEight Platform, drawings are linked to the relevant contracts, modifications, and work packages, allowing document control to effectively underpin the construction process. InEight Document is utilized by both contractors and owners for drawing management across capital projects of all sizes.

Construction ERP

Construction ERP systems are designed to manage corporate finances, but project teams require more granular control over costs and schedules than what typical ERPs provide. InEight is a specialized software for construction project controls that works in tandem with your ERP system. The integration with ERP allows for seamless synchronization of budgets, commitments, actual expenditures, and payment applications between the two platforms, ensuring that both accounting and project teams operate from the same data without the need for redundant data entry. On the project management side, InEight enhances capabilities by offering detailed cost control at the quantity level, accurate forecasting, effective change management, contract oversight, and real-time tracking of field progress, while the ERP continues to serve as the authoritative financial record. Used by contractors and owners across more than 60 countries, InEight supports capital projects exceeding $1 trillion in value. Many teams assessing construction ERP solutions opt to combine their ERP with InEight to bridge the gap between corporate financials and on-site realities, which is where cost overruns frequently occur. This collaboration allows finance to finalize its accounts as needed, while project teams avoid manual reconciliation of exported reports.

Construction Estimating

InEight's construction estimating software is designed with adaptable estimate frameworks, allowing users to arrange estimates according to the project's construction sequence—from initial concept through to detailed, resource-intensive proposals. The InEight Estimate tool meticulously assesses labor, teams, equipment, and materials with a precision that aligns with the project's requirements. It features integrated benchmarking that highlights discrepancies in your estimates by comparing them to historical data, preventing potential losses before they occur. The bid wizard and quote management functionalities streamline both setup and supplier pricing processes. Once a contract is secured, the estimate seamlessly transitions into the execution budget within the InEight Platform, which is linked to cost management, scheduling, and on-site progress tracking. This ensures that all assumptions behind the figures remain transparent throughout the project's execution, while completed results inform future estimates. From extensive capital initiatives to massive megaprojects, estimating teams in over 60 countries rely on InEight to create, evaluate, and justify their financial assessments.

Accounting Integration Yes 
Audit Trail Yes 
Bid Management Yes 
Billing & Invoicing Yes 
Building Product Database No 
Calculators Yes 
Change Orders Yes 
Contract Management Yes 
Cost Database Yes 
Customer Management Yes 
Customizable Templates Yes 
Electrical Estimating Yes 
HVAC Estimating Yes 
Historical Database Yes 
Job Costing Yes 
Plumbing Estimating Yes 
Price Data / Price Books Yes 
Project Management Yes 
Quote Management Yes 
Reporting/Analytics Yes 
Scheduling No 
Subcontractor Management Yes 
Takeoff Yes 
What-if Analysis Yes 

Construction Management

InEight's construction management software provides an integrated solution that links costs, scheduling, contracts, documentation, and field operations throughout the capital construction lifecycle. With specialized applications available on the InEight Platform, users can effectively navigate all stages of a project, from initial estimation and planning to execution, closure, and final handover. The system operates on a unified data model, ensuring that updates from the field automatically adjust budgets and forecasts in real-time, allowing all teams to work with consistent information. Its modular architecture enables contractors and owners to begin with essential tools and expand their capabilities as they standardize processes, while ERP integration ensures seamless synchronization with financial systems. Used by contractors and owners in over 60 countries for projects exceeding $1 trillion, InEight supports various sectors, including mining, nuclear, power and renewables, transportation, water, and oil, gas, and chemicals. For teams tasked with managing intricate capital projects, InEight offers the insight and control necessary for reliable project delivery.

Accounting Integration Yes 
Budget Tracking/Job Costing Yes 
CRM No 
Change Orders Yes 
Commercial Yes 
Contract Management Yes 
Contractors Yes 
Equipment Tracking No 
Estimating Yes 
Incident Reporting No 
Mobile Access Yes 
Offline Access Yes 
RFI & Submittals Yes 
Residential No 
Subcontractor Management Yes 
Timesheets Yes 

Construction Procurement

Construction procurement for capital projects encompasses everything from supplier quotes to subcontractor buyouts and subsequent commitments. InEight streamlines these processes by linking them to the project's financials. Within InEight Estimate, quote management efficiently collects pricing from suppliers and subcontractors during the bidding phase, ensuring that buyout decisions are grounded in documented quotes. InEight Contract then consolidates all contracts and commitments under a unified control system, with integration to ERP systems for financial tracking. Commitments are monitored against the budget in InEight Control, allowing committed costs to appear in forecasts as buyout activities progress. Meanwhile, InEight Change offers a standardized workflow for managing post-award scope changes, including analysis of their cost and schedule impacts. This collaborative approach ensures that buyers, project managers, and finance teams have access to a single record detailing what has been purchased, from whom, and at what cost, while keeping procurement status transparent for the entire project team from the award stage to final delivery.

Construction Risk Management

InEight incorporates construction risk management directly into its scheduling and budgeting processes, where critical decisions are made. The InEight Schedule features a risk register that operates in tandem with the project plan, enabling teams to pinpoint and evaluate risks in collaboration with subject matter experts while conducting quantitative analyses such as Monte Carlo simulations. This approach transforms uncertainties into risk-adjusted forecasts, allowing teams to strategize effectively. In terms of potential change orders, InEight Control integrates probability percentages that influence projected costs and revenues, ensuring that risks are reflected in forecasts at an early stage. When project scope changes occur, InEight Change manages change orders through established workflows that include assessments of cost and schedule impacts, ensuring that every alteration follows a systematic process with an accompanying record. Risk reporting is seamlessly linked to real-time project data within the InEight Platform, ranging from the portfolio level down to individual activities or cost items that present exposure. Teams operating in sectors such as nuclear, mining, and renewable energy leverage InEight to identify risks promptly, enabling proactive responses.

Construction Scheduling

InEight Schedule revolutionizes construction planning by integrating critical path method (CPM) scheduling with AI-driven insights derived from historical project data. This innovative tool assists planners in determining activities, durations, and logical sequences as they develop their schedules. Additionally, it incorporates risk assessment capabilities, allowing teams to conduct qualitative evaluations and quantitative simulations, providing a range of confidence levels for critical deadlines. The platform fosters collaboration among planners, project managers, and experts through review cycles enhanced by digital markups, capturing valuable field insights that traditional critical path methods may overlook. The comprehensive master schedule includes short-term planning for on-site teams, and any progress recorded in InEight Plan & Progress seamlessly updates on the InEight Platform without the need for duplicate data entry, ensuring the schedule remains accurate between formal assessments. For capital projects where delays can result in significant financial implications, InEight Schedule enables teams to strategically plan with visible risk factors. This solution is utilized by both owners and contractors for individual projects as well as ongoing capital initiatives.

Bid Management Yes 
Change Orders Yes 
Gantt Charts Yes 
Job Scheduling Yes 
Project Scheduling Yes 
Rescheduling Yes 
Staff Calendar No 
Task Management Yes 

Earned Value Management

InEight's earned value management (EVM) features are centered around assessing project progress through quantity-based completion metrics. The system's quantity tracking and uniform claiming processes in InEight Plan & Progress generate earned quantities directly from field data, ensuring that reported progress accurately reflects the work completed. InEight Control integrates budgetary data, forecasts, and actual expenditures in relation to earned value, allowing for detailed analysis down to the cost-item level to determine true percent complete. The forecasting capabilities utilize this same foundational data, enabling teams to customize their forecasting methods based on the performance of each item. This approach helps to identify productivity declines and their potential impact on overall costs early, allowing for timely interventions. Month-end reports leverage real-time data, and because the cost, schedule, and progress metrics are interconnected on the InEight Platform, earned value calculations are derived from the existing data that the team utilizes. This eliminates the need for separate bookkeeping, as EVM reporting meets the requirements of owners and executives seamlessly. For projects that mandate earned value reporting, InEight equips teams with a reliable solution to fulfill these obligations.

Jobsite Management

Jobsite management operates through a continuous cycle: strategize the tasks, deploy teams, and document the accomplishments. InEight Plan & Progress streamlines this process by utilizing structured work packaging that aligns work packages with daily objectives and the actual components that teams construct on-site. Teams can log daily reports, timesheets, and quantities installed using their devices, while tracking quantities against established claiming schemes transforms field data into measurable progress percentages. As Plan & Progress is integrated within the InEight Platform, the field data collected today automatically reflects in cost projections and schedule modifications, eliminating the need for redundant data entry. Additionally, InEight Compliance introduces digital forms for safety and quality assessments, incorporating field data collection and maintaining audit trails, ensuring that safety documentation is associated with the respective work. Superintendents receive actionable plans for crews, project managers gain reliable progress metrics, and administrative staff no longer need to deal with paper chasing each week.

Subcontractor

Subcontractor management is a continuous process throughout the lifecycle of a project, encompassing everything from initial quotes during the bidding phase to contracts at buyout, and then handling changes and payments until project completion. InEight simplifies this entire process by integrating each stage into a single platform. In the bidding phase, InEight Estimate enables effective quote management by gathering and comparing subcontractor bids, ensuring that buyout decisions are based on transparent data. Meanwhile, InEight Contract consolidates all subcontracts and commitments, keeping all agreements accessible and well-regulated, and seamlessly integrates with ERP systems to connect financial commitments. As project scopes evolve, InEight Change manages subcontractor change orders through established workflows that assess both cost and schedule implications. Payment processes are also streamlined through approval workflows in InEight Contract, which link to specific schedule of values claims. InEight Control tracks commitments against the budget, allowing for early detection of any increases in subcontractor costs in the financial forecast. For general contractors and project owners overseeing multiple trade partners, InEight ensures that all subcontractor relationships are thoroughly documented and easily accessible.

Takeoff

InEight Estimate's takeoff capabilities seamlessly link quantities to their corresponding priced cost items, allowing for a direct transformation of measured scope into a priced estimate without the need for redundant data entry across different platforms. These quantities are associated with the necessary resources required for execution, including labor, teams, equipment, and materials, all managed at the unit level within adaptable estimate frameworks. Any adjustments to quantities automatically trigger corresponding changes in pricing, while a comprehensive audit trail documents every modification made to the estimate, ensuring transparency during bid assessments and audits. The system features integrated benchmarking that compares quantities and unit costs against historical as-estimated and as-built data from previous projects, highlighting any discrepancies that deviate from past experiences. With model-based takeoff, quantities are automatically updated from the project model in InEight Model, ensuring the estimate remains consistent as the design progresses, ultimately serving as the project budget during execution. For contractors operating on slim margins, the integration of takeoff, pricing, and benchmarking significantly reduces the likelihood of bid inaccuracies.

3D View No 
Assembly Takeoff No 
Cross Section Creation No 
Electronic Plans No 
Elevation Checking No 
Error Checking No 
Site Balancing No 
Slope Routines No 
Subcontractor Management Yes 

Product Features

Alternatives

Alternatives

Deltek PPM Reviews

Deltek PPM

Deltek
Archdesk Reviews

Archdesk

EMS Operations